2017-2018 Closed Circuit TV Inspection of entire city sewer mains was performed. This project enabled the city to identify and complete the following repair projects.
- Approximately 20 point repairs of sewer mains
- Approximately 8,000 feet of sewer mains were lined with PVC pipe
Point repairs are generally two to four feet in length and restore the pipe’s integrity
PVC pipe lining projects generally repair a segment of pipe from a specific sewer manhole to another, average length is 350 feet of distance. Pipe lining restores the pipe segment’s integrity.